ACE completed several small projects in multiple areas of the refinery on existing Yokogawa CS 3000 system. ACE provided turn-key design, integration, and configuration services for these projects.
Yokogawa CS 3000 System Projects
Budget: | $2MM TIC |
---|---|
Scope: | Turn-Key Design, Integration and Configuration |